About

Quality system:

System name state Completion time
ISO9001 quality management system complete December 2014
ISO14001 environmental management system complete December 2014
Quality system team building:
Quality system team: 15 
Quality system specialist: 1 person
Certified ISO Internal Auditor: 6



















Quality control process:



IQC: quality control of incoming materials, the qualification rate of incoming materials batch is more than 98%, and the inflow of quality risk is prohibited.
QC: product quality 100% inspection, PCB pass through rate more than 98%.

QC: product quality 100% inspection, PCB pass through rate more than 98%. IPQC: supervise the on-line process, find out the quality problems of the production line in time, and ensure the pass through rate of the finished products is 98%.
OQA: 100% functional inspection, 100% visual inspection and 100% packaging inspection before warehousing,Ensure that the qualified rate of finished products is 100%.



 

Copyright © 2020-2023 Chaosheng line technology (Shenzhen) Co., Ltd All rights reserved    ICP prepared 粤ICP备20043462号- number

    Weibo